Project Portfolio
By Samuel Yambo

Cpu scheduler simulation

Interactive

Cpu scheduler simulation

Implemented 3 CPU scheduling algorithms simulated and evaluated each with the set of eight processes

Linked list Project

Interactive

Linked list

Linked list assignment with several test cases to test functionality of linked list
This was done using different sentences and various functions such as

Iris flower set Project

Non-Interactive

Iris flower set

For each of the four flower attributes these values were calculated and then normalized

A scatter plots of the data, two features at a time based off A manual decision tree classifier based off of petal width and length

Epa car data Project

Non-Interactive

Epa car data

Finds vehicles that are within a user provided range and, displays information (make, model)
about vehicles that fall within that range

Ask the user to choose from 3 options:

Prompt user to input the preferred way to produce the plot: